The land surveys, geological structure and analysis of the solid waste site planned to be erected are going to be conducted in line with Environmental Impact Assessment Report. The geological structure of the site will be considered and based on the Environmental Impact Assessment Report, the design of the solid waste field will be made and the area to be allocated will be subject to Project preparation process accompanied by all units of use. The technical specifications will be compiled in line with the Project and the solid waste disposal site will proceed to the production stage.